Featured USA Projects |
| The Residences |
Natick, Massachusetts, USA |
 |
Started:
Completed:
PT Details:
|
June 2006
December 2006
· Unbonded System
· 160,000 sq ft of PT slabs and beams
|
 |
| River House |
Grand Rapids, Michigan, USA |
 |
Started:
Completed:
PT Details:
|
February 2007
In progress
· Bonded and Unbonded Systems
· Vertical PT in shear walls
· Vertical PT using multistrand CCL-E2 anchors
· Transfer Girders using multistrand CCL-E5 anchors
· Supply of Unbonded PT System
|
 |
| The Wilmot Cancer Center |
Rochester, New York, USA |
 |
Started:
Completed:
PT Details:
|
October 2006
March 2007
· Bonded Flat Slab System
· 140,000 sq ft of PT slabs
· Supply of CCL Bonded flat slab anchors and ducts
|
 |
| Natick Mall Deck D |
Natick, Massachusetts, USA |
 |
Started:
Completed:
PT Details:
|
January 2007
In progress
· Unbonded System
· 200,000 sq ft of PT beams and slabs
· 0.5" and 0.6" unbonded fully encapsulated tendons
|
 |
| Gaylord National – Resort & Convention Center |
Oxon Hill, Maryland, USA |
 |
Started:
Completed:
PT Details:
|
October 2005
In progress
· 2 Million sq ft of PT slabs and beams
· Post-tensioned transfer girders
· Unbonded system
· DHME-CCL E5 multistrand bonded system
|
 |
| Carnegie Mellon University Parking |
Pittsburgh, Pennsylvania, USA |
 |
Started:
Completed:
PT Details:
|
June 2005
September 2005
· Unbonded system for the parking structure
· 70,000 sq ft of PT slabs on structural steel beams
|
 |
|
|
 |
 |
Featured CCL Group Projects |
| The Helicon |
London, England |
 |
Started:
Completed:
PT Details:
|
January 1998
August 1998
· 7-story office block with 12" deep floor slab
- saved 2 metres in building height
- allowed increased spans for flexible interior office layout
· Ancon CCL - UN15 unbonded system
|
 |
| Wanders Hotel |
Johannesburg, South Africa |
 |
Started:
Completed:
PT Details:
|
1999
1999
· 230 bedroom hotel complex, designed with deluxe and presidential suites
· CCL unbonded anchorages
· 150,000 sq ft of post-tensioned floor area
· 495 tons of rebar
|
 |
| Burj Dubai Development – Residences |
Dubai, UAE |
 |
PT Details:
|
· 6 residential towers
· DHME-CCL S5 System
· Total of 1,300,000 sq ft of PT slabs (two-way)
|
 |
| KNPC Head Office |
Safat, Kuwait |
 |
PT Details:
|
· DHME-CCL FS System
· 72,000 sq ft of post-tensioned floor area
|
 |
|
|
 |